Concrete Calculator

Free concrete calculator for slabs, footings, columns and stairs. Get cubic yards, 80lb, 60lb and 40lb bags, and cost in seconds.

🧱 Concrete Calculator

Calculate concrete volume, bags, and cost for slabs, footings, columns, or stairs

Slab / Footing
Round Column
Stairs

How This Concrete Calculator Works

This tool supports three common pour types: flat slabs/footings, round columns, and poured concrete stairs. Pick the tab that matches your project, enter your measurements, and the calculator returns volume in cubic yards and cubic feet, plus the number of pre-mixed bags you’d need if you’re not ordering ready-mix.

The Formulas Used

  • Slab/Footing: Volume = Length × Width × (Thickness ÷ 12), converted to cubic yards by dividing by 27.
  • Round Column: Volume = π × (radius)² × Height, for each column, multiplied by the column count.
  • Stairs: Each step is treated as a rectangular block that decreases by one step-height going up; total volume is the sum of all steps.

Bag Coverage Reference

Bag SizeYields (cubic ft)Bags per Cubic Yard
40 lb≈ 0.30 cu ft≈ 90 bags
60 lb≈ 0.45 cu ft≈ 60 bags
80 lb≈ 0.60 cu ft≈ 45 bags

Frequently Asked Questions

How much extra concrete should I order?
Most contractors add a 5-10% waste buffer to account for spillage, uneven subgrade, and form imperfections. For ready-mix truck orders, rounding up to the nearest quarter-yard is standard practice.
Is it cheaper to use bagged concrete or ready-mix delivery?
For pours under 1 cubic yard, bagged concrete is usually more economical since delivery minimums often apply to ready-mix trucks. For anything above 1-2 cubic yards, ready-mix delivery is typically cheaper per unit and saves significant labor.
Does this calculator account for rebar or wire mesh volume?
No — reinforcement typically displaces a negligible amount of volume and is not subtracted. For large rebar cages, professional estimators sometimes apply a small deduction, but it’s rarely significant for residential projects.